Rehabilitation of Runway and Taxiway, Extension of Box Culvert and Ancillary works at Asaba International Airport, Delta State, Nigeria
Brief Description
This project consists of—
· The rehabilitation of 3.4 km (45 m + 2 x 7.5 m width shoulders) failed section of Runway,
· The rehabilitation of failed section of Taxiway (25 m +2 x 17.5 m width shoulders),
· Correction of existing Bumpy profile, overlay of existing Runway and Taxiway, ramping of edges,
· Construction of subsurface drains across the Taxiways,
· Construction of crash road for Runway at both ends,
· The grading of Runway strip and construction of parallel trapezoidal earth drain,
· Extended of Box culvert (80 m) and others associated concrete works,
· Blast Pad at Runway 29 End (60m x 45m),
· Fire station roads and others associated works,
· Pavement Markings and
· Signage & Safety Measures.