Setraco has several fixed and semi-mobile asphalt plants, capable of producing between 120 to 220 tons per hour. Product quality is assured by regular in-house inspections and testing by the QA/QC department, coupled with sourcing of the best grade raw materials from suppliers, including aggregates from the Company's own quarries.


See our work

Latest Projects

This project consists of—

·      The rehabilitation of 3.4 km (45 m + 2 x 7.5 m width shoulders) failed section of Runway,

·      The rehabilitation of failed section of Taxiway (25 m +2 x 17.5 m width shoulders),

·      Correction of existing Bumpy profile, overlay of existing Runway and Taxiway, ramping of edges,

·      Construction of subsurface drains across the Taxiways,

·      Construction of crash road for Runway at both ends,

·      The grading of Runway strip and construction of parallel trapezoidal earth drain,

·      Extended of Box culvert (80 m) and others associated concrete works,

·      Blast Pad at Runway 29 End (60m x 45m),

·      Fire station roads and others associated works,

·      Pavement Markings and

·      Signage & Safety Measures. 


This project consists of—

·      The new 141.98 km asphaltic concrete carriageway and the rehabilitation of the existing one from Shuwarin to Azare and Dutse to Kwanar Huguma.

·      The whole road network includes Dutse Kwanar Huguma Road, Dutse Township Road, Dutse Link Road, Shuwarin Kiyawa Road, Kiyawa Bypass, Kiyawa Jama’are Road, Jama’are Bypass, Jama’are Azare Road & Azare Bypass.

·      Construction of Two new Bridges at Kiyawa (75m) & Jama’are (315m).

·      One new Flyover at Shuwarin (80 m). 

This project consists of—

·      Construction of a new 360m long pre-stressed concrete bridge with 10 no of spans, each 36m long.

·      Also a provision of new 1.450 km Approach Roads (750 m Calabar Side & 700 m Ikom Side of the new Bridge).

·      Completion period 24 months.