This project consists of—
· The rehabilitation of 3.4 km (45 m + 2 x 7.5 m width shoulders) failed section of Runway,
· The rehabilitation of failed section of Taxiway (25 m +2 x 17.5 m width shoulders),
· Correction of existing Bumpy profile, overlay of existing Runway and Taxiway, ramping of edges,
· Construction of subsurface drains across the Taxiways,
· Construction of crash road for Runway at both ends,
· The grading of Runway strip and construction of parallel trapezoidal earth drain,
· Extended of Box culvert (80 m) and others associated concrete works,
· Blast Pad at Runway 29 End (60m x 45m),
· Fire station roads and others associated works,
· Pavement Markings and
· Signage & Safety Measures.
This project consists of—
· The new 141.98 km asphaltic concrete carriageway and the rehabilitation of the existing one from Shuwarin to Azare and Dutse to Kwanar Huguma.
· The whole road network includes Dutse Kwanar Huguma Road, Dutse Township Road, Dutse Link Road, Shuwarin Kiyawa Road, Kiyawa Bypass, Kiyawa Jama’are Road, Jama’are Bypass, Jama’are Azare Road & Azare Bypass.
· Construction of Two new Bridges at Kiyawa (75m) & Jama’are (315m).
· One new Flyover at Shuwarin (80 m).
This project consists of—
· Construction of a new 360m long pre-stressed concrete bridge with 10 no of spans, each 36m long.
· Also a provision of new 1.450 km Approach Roads (750 m Calabar Side & 700 m Ikom Side of the new Bridge).
· Completion period 24 months.