This project consists of—
· The new 141.98 km asphaltic concrete carriageway and the rehabilitation of the existing one from Shuwarin to Azare and Dutse to Kwanar Huguma.
· The whole road network includes Dutse Kwanar Huguma Road, Dutse Township Road, Dutse Link Road, Shuwarin Kiyawa Road, Kiyawa Bypass, Kiyawa Jama’are Road, Jama’are Bypass, Jama’are Azare Road & Azare Bypass.
· Construction of Two new Bridges at Kiyawa (75m) & Jama’are (315m).
· One new Flyover at Shuwarin (80 m).