Setraco has market-leading operations producing a diverse and innovative range of precast concrete elements and solutions catering to the commercial, infrastructure and residential construction sectors.

We offer a wide range of standard as well as engineered precast solutions, from concrete blocks and traffic management products to structural and architectural components for building and infrastructure, such as columns, wall panels, tunnel liners and rail products.

See our work

Latest Projects

This project consists of—

·      The rehabilitation of 3.4 km (45 m + 2 x 7.5 m width shoulders) failed section of Runway,

·      The rehabilitation of failed section of Taxiway (25 m +2 x 17.5 m width shoulders),

·      Correction of existing Bumpy profile, overlay of existing Runway and Taxiway, ramping of edges,

·      Construction of subsurface drains across the Taxiways,

·      Construction of crash road for Runway at both ends,

·      The grading of Runway strip and construction of parallel trapezoidal earth drain,

·      Extended of Box culvert (80 m) and others associated concrete works,

·      Blast Pad at Runway 29 End (60m x 45m),

·      Fire station roads and others associated works,

·      Pavement Markings and

·      Signage & Safety Measures. 


This project consists of—

·      The new 141.98 km asphaltic concrete carriageway and the rehabilitation of the existing one from Shuwarin to Azare and Dutse to Kwanar Huguma.

·      The whole road network includes Dutse Kwanar Huguma Road, Dutse Township Road, Dutse Link Road, Shuwarin Kiyawa Road, Kiyawa Bypass, Kiyawa Jama’are Road, Jama’are Bypass, Jama’are Azare Road & Azare Bypass.

·      Construction of Two new Bridges at Kiyawa (75m) & Jama’are (315m).

·      One new Flyover at Shuwarin (80 m). 

This project consists of—

·      Construction of a new 360m long pre-stressed concrete bridge with 10 no of spans, each 36m long.

·      Also a provision of new 1.450 km Approach Roads (750 m Calabar Side & 700 m Ikom Side of the new Bridge).

·      Completion period 24 months.